Bases Fixing Angles For S69B2 Mast
- ZCJJ
- China
- 5days
- 20sets
Guyana Tower Crane, French Guiana Tower Crane, tower crane foundation design
tower crane sizes
truss tower crane project
Products Specification
Type , Model: Bases Fixing Angles For S69B2 Mast
Size: 2M
Use for : L69 , L69B2 , L69B 2m L type mast, 2mx2mx3m
Materials: Q345B
Process: Blasting derusting,
Painting: Under painting , Middle painting, Surface painting.
Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.
Bases Fixing Angles For S69B2 Mast
Tower Crane Knowledge sharing:
Enterprises should attach importance to the safety management of the installation and disassembly process of high-rise tower cranes
Enterprises should attach importance to the safety management of the installation and disassembly process of high-rise tower cranes and strengthen the safety technical management of the installation and disassembly of high-rise tower cranes.
1. Units engaged in tower crane installation and disassembly at the construction site must obtain professional contractor qualification. Disassembly and assembly operation personnel must be trained by professional safety technology, the implementation of the post certificate.
2. Establish the second-level approval system for the installation and disassembly of high-rise tower cranes. Before the installation and disassembly of the tower crane, the installation and disassembly schemes and specific safety technical measures must be formulated according to the environment and conditions of the construction site.
Bases Fixing Angles For S69B2 Mast
The mechanical performance of the tower crane and the characteristics of auxiliary hoisting equipment. The installation and disassembly schemes shall be examined and approved by the technical person in charge of the professional construction unit and the general contractor.
1. According to the approved construction plan of hoisting and dismantling of high-rise tower. The foundation of high-rise tower crane should be inspected before integral installation
Before the installation and disassembly, the signature and disclosure of targeted safety technology must be made, and the division of responsibility and unified command should be carried out according to the operating procedures.
In the disassembly and assembly operation, each working procedure shall be under the unified command of a designated person, a designated post, and a designated person. Disassembly and assembly operations should be set up warning area, and set up special monitoring.
4. Stability of tower cranes in various states during installation and disassembly must be guaranteed. The layout and spacing of the straight parts attached to the wall of the high-rise tower crane shall conform to the provisions of the instruction.
Bases Fixing Angles For S69B2 Mast
5. high-rise tower crane lifting, lowering section should strictly comply with the specification. During jacking operation, the hydraulic system should carry out no-load operation and adjust the clearance between the jacking sleeve roller and the standard section of the tower body to keep the lifting torque and balancing torque in balance.
During the jacking process, mechanical braking will be returned, and the tower crane rotation and other operations are strictly prohibited; Jacking operation should be carried out during the day, and the wind must stop when the wind is at level 4 or above
Before the tower crane is removed to the allowable cantilever height, it is strictly prohibited to remove the attached wall rod.
Strictly implement the management system of inspection and acceptance of high-rise tower cranes. Upon the completion of the overall installation of the tower crane, the general contractor, the subcontractor .
the leasing unit and the installation unit shall jointly inspect and accept the crane, and entrust the unit with the inspection qualification recognized by the construction administrative department with the inspection.
The high-rise tower cranes which have not passed the acceptance inspection and have not passed the inspection by the testing unit shall not be put into use. In addition, the competent authorities of the industry shall strengthen the supervision and management of high-rise tower cranes.
Bases Fixing Angles For S69B2 Mast
Gradually establish the qualification management system of tower crane leasing enterprises, and strengthen the qualification management of professional units for installation and disassembly.
Safety supervision institutions should also strengthen the supervision and management of high-rise tower cranes entering the construction site, and establish a system for the record and registration of high-rise tower cranes.