1 Safety education for tower crane drivers and signal workers, pay attention to the safety of construction when the tower crane is running on the surrounding roads, and it is strictly forbidden to hang over the wall of the site.

S24D1 Mast Section

 2 Clear signs are placed near the road to remind passers-by of the safety of passage.
3 The high-voltage lines and chimneys on the West side of the field area are equipped with a fir protective frame and a fir protective base is set up.

There is also a drainage facility to ensure that the foundation has sufficient bearing capacity. Before the shelf is set up, put the axis and the material is neatly separated.

S24D1 Mast Section

 Before entering the field, there is no rot, cracking, and depletion. The pole parts of the pole scaffolding use 8 # lead wire, and the spacing between the poles and the bars must not be more than 1.8 M.

The scaffolding of the pole must ensure that the structure is not deformed, and the distance between the edge and the high-voltage line must be guaranteed to be 0.75 M.

The windy weather must observe whether the pole is displaced or tied firmly.

S24D1 Mast Section